skip to main | skip to sidebar

Domus Blog - Team Superstar (Battersea 2) & Team Unkown (Battersea 5)

Wednesday, May 23, 2007

Stage 3

















Additional cut out on the south side in the living and kitchen. This will allow light and a ground level view of the horizon. A look into the materials of rammed earth which we will use from the digging out of the site. Rammed earth is an aesthetic structural walling system.
The next stage is to work out the landscaping ontop of the mounds.
Posted by Jim at 5:26 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (37)
    • ▼  May (27)
      • Posters For Battersea 5
      • FINAL SECTIONS AND FLOORPLAN
      • Final Layout - TEAM SUPERSTAR (Battersea 2)
      • last minutes 18/4 B2 tute
      • Final Renders
      • No title
      • PREP MODEL
      • Tutorial 4 (18/5) Minutes
      • final review
      • BATTERSEA 5: Final Presentation
      • Battersea 5: Information
      • Stage 3
      • one of our ever changing floor plans
      • Images of partly underground house
      • Battersea 5 Working Model
      • Ashleigh's Concept for Domus
      • Battersea 5-First CAD drawings
      • Team Superstar Design
      • Battersea 5 tutorial 3
      • TUTE THREE - Batersea two (Team Superstar)
      • photos of out stunning site. about 200km south of ...
      • A look into the form of how our building will work...
      • Chelsea's Concept for Domus
      • Tutorial 2 Minutes-Battersea 5
      • TUTE TWO - BATTERSEA TWO (SUPERSTAR)
      • Design Ideas-Battlesea 5
      • TEAM SUPERSTAR (BATTERSEA TWO)
    • ►  April (7)
    • ►  March (3)

Contributors

  • Alexander Paterson
  • Chelsea
  • Jim
  • Lucy
  • ash
  • kylie chu
  • luciano